Close Menu
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

Meta launches Muse Code, an AI agent for large code bases

August 5, 2026

Klaviyo acquires Elias Torres’ Agency in full-circle reunion for tech founders

August 5, 2026

Jack Ma Quietly Invests $30 Million in AI Insurance Startup Corgi

August 5, 2026
Facebook X (Twitter) Instagram
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
Home » Texas halts new data centers as governor calls for audits
AI

Texas halts new data centers as governor calls for audits

IQ TIMES MEDIABy IQ TIMES MEDIAAugust 4, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


Tech companies and developers have been scouring the U.S. for places to build data centers, and they’ve been drawn to Texas’ loose regulations and seemingly abundant power supply. Only Virginia hosts more data centers than Texas.

But even Texas can be pushed to the brink. Governor Greg Abbott announced Monday that all new data center projects will need to be audited by both the Public Utility Commission of Texas (PUCT) and the state’s grid operator, the Electric Reliability Council of Texas (ERCOT).

The size of ERCOT’s interconnection queue has grown dramatically this year. In January, ERCOT had 233 gigawatts of projects waiting to connect to its grid. In less than six months, that figure had more than doubled. Today, Abbott’s office said ERCOT is tracking 474 gigawatts of new connection requests. About 90% of those are data centers, according to the grid operator.

Some of those projects are simply paper proposals at this point. Because queues for grid connections have grown so long, the first action many developers take is to get in line. Many projects fizzle out as they progress.

If even a fraction of those proposed projects come to fruition, they could overwhelm the Texas grid. The interconnection queue today represents more than five times ERCOT’s total peak demand. 

While many data center operators, including Google and Microsoft, have been drawn to Texas for its ample natural gas reserves, wind and solar have helped ERCOT keep pace with growing electricity demand, according to the Energy Information Administration (EIA). Utility-scale solar capacity grew fourfold between 2021 and 2025. Meanwhile, electricity prices declined over much of that time, according to a report from Amperon.

Electricity prices in Texas are relatively affordable compared with other states, but they have been rising. Data centers and crypto-mining facilities have pushed prices higher, according to the EIA.

Abbott clearly wants to head off that trend. The governor has directed PUCT and ERCOT to collect a range of information about proposed data centers, including their on- and off-site demand for electricity and water, noise-mitigation efforts, light controls, use of tax incentives, and ownership details.

Historically, Texas has favored lighter regulation than many other states when it comes to development. Houston famously lacks a zoning code, and the state has a business-friendly regulatory environment. But data centers have become a flash point across the country, including in Texas. Abbott had previously tried to coax data centers into providing more information through a voluntary survey. Most didn’t respond, so he’s taking a heavier hand to compel compliance. 

Depending on what emerges from the audits, Texas’ days as a data center mecca may be coming to a close.

When you purchase through links in our articles, we may earn a small commission. This doesn’t affect our editorial independence.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
IQ TIMES MEDIA
  • Website

Related Posts

Meta launches Muse Code, an AI agent for large code bases

August 5, 2026

Klaviyo acquires Elias Torres’ Agency in full-circle reunion for tech founders

August 5, 2026

Shopify says AI search is driving more traffic and sales, not replacing Google

August 5, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

School backpacks: How to know whether they’re too heavy for kids

August 4, 2026

Ousted ’60 Minutes’ correspondents will work with Columbia students

August 3, 2026

Trump overhaul could gut Head Start preschool quality standards

August 3, 2026

College computer science majors are down. AI for everyone else is up

August 3, 2026
Education

School backpacks: How to know whether they’re too heavy for kids

By IQ TIMES MEDIAAugust 4, 20260

Backpacks can be fashionable and functional, but they can also be too heavy — weighed…

Ousted ’60 Minutes’ correspondents will work with Columbia students

August 3, 2026

Trump overhaul could gut Head Start preschool quality standards

August 3, 2026

College computer science majors are down. AI for everyone else is up

August 3, 2026
IQ Times Media – Smart News for a Smarter You
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 iqtimes. Designed by iqtimes.

Type above and press Enter to search. Press Esc to cancel.