Close Menu
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

Sam Altman is still making the case for parenting via ChatGPT

August 1, 2026

This $9 key physically locks your most addictive apps

August 1, 2026

An OpenAI Product Manager’s Advice for AI Prompts

August 1, 2026
Facebook X (Twitter) Instagram
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
Home » SpaceX won’t remove all of xAI’s unpermitted turbines for another year
AI

SpaceX won’t remove all of xAI’s unpermitted turbines for another year

IQ TIMES MEDIABy IQ TIMES MEDIAJuly 31, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


SpaceX said on Thursday that it will remove the unpermitted turbines powering its xAI data centers near Memphis as it transitions to a permanent, 1.2 gigawatt natural gas power plant. 

The turbines won’t be completely removed until July 2027, though. SpaceX said that it’s currently operating 69 gas turbines to power the Colossus data centers, of which many have been operating for months. The NAACP and Southern Environmental Law Center have sued xAI over the use of unpermitted turbines. SpaceX acquired xAI in February. 

In its IPO filing, SpaceX said it plans to buy $2.8 billion worth of gas turbines for its data centers over the next three years.

SpaceX claims that it is allowed to operate the existing turbines without permits because they remain on the trailers they were shipped on. But federal regulations say that the turbines xAI has been using, regardless of what they sit on, require permits because of their size and how they’re being used.

The turbines are currently located south of Memphis in Mississippi, just over the border with Tennessee. The region is among the most polluted in the U.S., and xAI has been operating gas turbines that have the potential to emit more than 2,000 tons of smog-forming NOx per year.

Last month, the Department of Justice sided with SpaceX in the NAACP’s lawsuit, saying the unpermitted turbines were a matter of “national, economic, and energy security.”

The new power plant that SpaceX is building will consist of 41 gas turbines ranging in size from 16.48 megawatts to 50 megawatts, according to permit documents issued by the state of Mississippi. They appear to be different from those currently in use, though TechCrunch could not verify the specific models of the 69 existing turbines.

Earlier this year, Elon Musk bought APR Energy, a company that specializes in temporary natural gas power. Based on an archive of the company’s site before it was taken down, the turbines in the company’s fleet also appear to be different from those cited in permits for the new, permanent power plant. 

Given that APR Energy’s turbines aren’t likely to be part of the new Colossus power plant, the new turbine fleet is likely intended for another, unannounced project.

When you purchase through links in our articles, we may earn a small commission. This doesn’t affect our editorial independence.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
IQ TIMES MEDIA
  • Website

Related Posts

Sam Altman is still making the case for parenting via ChatGPT

August 1, 2026

This $9 key physically locks your most addictive apps

August 1, 2026

OpenAI reportedly finds evidence that more of its agents ran amok

July 31, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Barring Afghan girls from school takes emotional and community tolls

July 31, 2026

Oprah Winfrey’s South African school for girls to close after 20 years

July 31, 2026

Howard University readmits more than 200 unenrolled students

July 29, 2026

Michigan school investigation turns up sexual misconduct reports against Epstein, others

July 29, 2026
Education

Barring Afghan girls from school takes emotional and community tolls

By IQ TIMES MEDIAJuly 31, 20260

Every day, even after the Taliban barred Afghan girls from education, Fariba went to school.…

Oprah Winfrey’s South African school for girls to close after 20 years

July 31, 2026

Howard University readmits more than 200 unenrolled students

July 29, 2026

Michigan school investigation turns up sexual misconduct reports against Epstein, others

July 29, 2026
IQ Times Media – Smart News for a Smarter You
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 iqtimes. Designed by iqtimes.

Type above and press Enter to search. Press Esc to cancel.