Close Menu
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

The ‘Claude-Gap’ Relationship: One Partner Sleeps, Another Vibe Codes

March 28, 2026

How One Business Owner Is Using AI During Tax Season

March 28, 2026

‘Informed’ Polymarket Traders Have Netted $143 Million Since 2024

March 28, 2026
Facebook X (Twitter) Instagram
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
  • Home
  • AI
  • Education
  • Entertainment
  • Food Health
  • Health
  • Sports
  • Tech
  • Well Being
IQ Times Media – Smart News for a Smarter YouIQ Times Media – Smart News for a Smarter You
Home » Meta adds another 650 MW of solar power to its AI push
AI

Meta adds another 650 MW of solar power to its AI push

IQ TIMES MEDIABy IQ TIMES MEDIAMay 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


Meta signed another big solar deal on Thursday, securing 650 megawatts across projects in Kansas and Texas.

American utility and power generation company AES is currently developing the solar-only projects, with 400 megawatts to be deployed in Texas and 250 megawatts in Kansas, the company told TechCrunch.

Meta said it signed the deal to power its data centers, which have been expanding to support its growing AI operations. The company already has more than 12 gigawatts of capacity in its renewable power portfolio.

AES typically signs new power purchase agreements two to three years before they begin commercial operations, and the average term for such deals is 15 to 20 years, spokesperson Katie Lau said.

This is the fourth solar deal that Meta has announced this year. All are in Texas, with one clocking in at 595 megawatts, another at 505 megawatts, and the final two hitting 200 megawatts each.

Texas has become a hotbed of solar development recently, leading the nation in new solar capacity installed in 2023 and 2024, according to the Solar Energy Industries Association. The state has ample sunshine, quick permitting, and speedy grid connections.

The latter two are particularly helpful when deploying a new solar capacity. With permitting and grid connections in place, a solar farm can be built in months rather than years. It doesn’t hurt that new solar is one of the cheapest forms of new generating capacity, even before subsidies are considered.

Plus, data centers needn’t wait for construction to finish since solar farms can be phased in, with electricity flowing before project completion. Indeed, in a press release, AES CEO Andrés Gluski called out solar’s “fast time-to-power and low-cost electricity” as key attributes that have attracted hyperscalers like Meta.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
IQ TIMES MEDIA
  • Website

Related Posts

Memory chip giant SK hynix could help end ‘RAMmageddon’ with blockbuster US IPO

March 27, 2026

VCs are betting billions on AI’s next wave, so why is OpenAI killing Sora?

March 27, 2026

David Sacks is done as AI czar — here’s what he’s doing instead

March 27, 2026
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

2 students dead and 7 injured in Tennessee school bus crash

March 27, 2026

Suburban Detroit school settles lawsuit over Pledge of Allegiance

March 27, 2026

Changes to Native American tuition waiver could expand access to higher education for thousands

March 27, 2026

Student loan borrowers in SAVE plan directed to prepare for repayment

March 27, 2026
Education

2 students dead and 7 injured in Tennessee school bus crash

By IQ TIMES MEDIAMarch 27, 20260

HUNTINGDON, Tenn. (AP) — A school bus crash in west Tennessee on Friday killed two…

Suburban Detroit school settles lawsuit over Pledge of Allegiance

March 27, 2026

Changes to Native American tuition waiver could expand access to higher education for thousands

March 27, 2026

Student loan borrowers in SAVE plan directed to prepare for repayment

March 27, 2026
IQ Times Media – Smart News for a Smarter You
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • About Us
  • Advertise With Us
  • Contact us
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 iqtimes. Designed by iqtimes.

Type above and press Enter to search. Press Esc to cancel.